25-Sep-04	Sign Limestone Workings 25-Sep-04	Iron work inserted into the tunnel wall 25-Sep-04	The diesel powered train made by the Grosvenor Caving Club 25-Sep-04	The diesel powered train made by the Grosvenor Caving Club 25-Sep-04	Iron work inserted into the tunnel wall 25-Sep-04	The Eimco shovel that was used to remove the limestone
25-Sep-04	The Eimco shovel that was used to remove the limestone 25-Sep-04	Trudging up to the bridge that spans the 100ft high chamber 25-Sep-04	Trudging up to the bridge that spans the 100ft high chamber 25-Sep-04	The bridge that spans the chamber 25-Sep-04	The bridge that spans the chamber 25-Sep-04	Iron work inserted into the tunnel wall
25-Sep-04	Small climb in the limestone workings 25-Sep-04	Carts in the limestone working tunnels 25-Sep-04	Nameplate on one of the carts in the limestone workings 25-Sep-04	Strange wooden tripod 25-Sep-04	Ladder climb to a higher level in the limestone workings 25-Sep-04	Ladder climb to a higher level in the limestone workings
25-Sep-04	Ladder climb to a higher level in the limestone workings 25-Sep-04	Ladder climb to a higher level in the limestone workings 25-Sep-04	Uphill towards the traverse 25-Sep-04	Uphill towards the traverse 25-Sep-04	Climb just after the traverse 25-Sep-04	Climb just after the traverse
25-Sep-04	ACG members on the platform after the climb 25-Sep-04	Pure white fungus growing from the wood 25-Sep-04	Small tunnel that leads to the 200ft level 25-Sep-04	Small tunnel that leads to the 200ft level